Saturday, September 1, 2007

Back in step

Not a lot of progress yesterday, but they did put our vent and ductwork back in place!


They've also installed the ductwork for the exhaust fans in the bathrooms and the lights that we had installed over the showers.


They have installed two of the hose faucets (the one on the east side of the house and the one in the garage, but we are still missing the additional one that we paid to have installed on the west side of the house). And no, we really haven't figured out why the default is to have only one external faucet on the house, and the second one inside the garage. I mean, why do we really need a faucet inside the garage -- so that we'll be able to hose off the garage? In the future, I guess we can install a wash sink out there, but we don't have any plans to do that any time soon. (You can see the faucet in the lower left-hand corner of this picture.)

No comments: